NEWKalOS now forecasts rotating-equipment failure up to 14 days out — read the IPG Asia engineering note
VyuOS 2.0Eight intelligences, one living twin of your plant

The operating system
for your factory floor.

VyuOS builds a living digital twin of your plant on the PLC, SCADA and ERP you already run — then eight specialist intelligences predict, inspect, comply and act on it. Deployed in your cloud. Owned outright by you.

Explore the VyuOS suite
READS FROM  SIEMENS S7 · SCADA · SAP B1 · OPC-UA · MQTT · CMMS
KalOS
PREDICTION
● LIVE

Bearing drift · Extruder 3

Vibration +34% over 11 shifts. Est. failure in 48–72 h.

● Work order drafted → awaiting approval
PLANT OEE · LIVE
78.4%▲ 6.1 pts
Extruder 3 · Laminator L2 · Slitter S1VyuOS · LIVE PLANT TWIN
03 — THE PROBLEM

Plants are buying AI. The floor still runs on guesswork.

Plants already record more machine data than ever. It sits in PLCs, SCADA screens, ERP and Excel, and none of it talks to the rest. So problems are found after they have already cost a shift.

A TYPICAL MID-SIZE PLANT, TODAY
ISOLATED SYSTEMHAND-OFF THAT BREAKS
PLC · Siemens S7

Logs every vibration. Nobody reads it.

SCADA

Alarms on one screen, in one room.

ERP · SAP B1

Orders and stock, updated at shift end.

Excel shift report

Rebuilt by hand every morning.

WhatsApp groups

Where the real alerts happen.

CMMS & logbooks

Maintenance history, half on paper.

QC lab sheets

Defects found in sampling, after the batch.

PLANT HEAD · 9:00 REVIEW
“Why did Extruder 3 stop yesterday?”

Answer pieced together from phone calls, two spreadsheets and a WhatsApp thread.

HOW A BREAKDOWN UNFOLDS TODAY7 h 20 min of warning was in the data. Nobody saw it.
06:10

Bearing vibration starts climbing. The PLC logs it.

09:40

An operator hears a noise from Extruder 3.

10:15

Supervisor calls maintenance. The engineer is on another line.

13:30

Line stops. Four to six hours of downtime follow.

Next day

The Excel report says “breakdown”. Cause unknown.

Illustrative plant scenario: operator notices → calls supervisor → waits for engineer → line down.
NOT WIRED TO THE FLOOR

AI that never touches the PLC

Chat pilots, BI dashboards and consultant reports run on exports. They describe yesterday, not the line in front of you.

FOUND TOO LATE

Failures surface after they cost

Breakdowns show up when the line stops. Defects show up in sampling, or at the customer.

MANUAL REPORTING

Shift reports rebuilt in Excel

Hours go into copying numbers between systems every morning. The report is read after the shift is over.

HEAVY ROLLOUTS

Platforms nobody adopts

Rip-and-replace MES projects take a year, need new sensors and consultants, and end up as one more screen nobody opens.

“AI without operational integration creates reports, not results.”
02 — THE SUITE

One twin at the centre.
Eight intelligences in formation.

Vyuha is the battle formation from the Mahabharata — every unit in its place, all moving as one. VyuOS is the core digital twin; each module plugs into it, reads the same live map of your plant, and adds one specialist capability.

04 — HOW IT WORKS

From a vibration on line 3 to a signed work order — in one pass.

No new sensors to start. No SCADA replacement. VyuOS reads what you already run and closes the loop with a human in it.

STEP 01 OF 05 · WEEKS 1–2

Connect

Read-only links to PLC, SCADA, ERP and CMMS you already run. Nothing on the floor is replaced or rewired.

PROTOCOLS
OPC-UAMQTTModbusREST
ILLUSTRATIVE PLANT SCENARIO
01 / 05
BEFORE · THE SAME FAULT
Operator notices vibrationCalls supervisorWaits for engineer
4–6 hof unplanned downtime
WITH VYUOS
Flagged 48 h earlyPlain-English causeMaintenance scheduled
0unplanned stops
−20%Unplanned downtimeon monitored production lines
−70%Manual diagnostic effortroot cause in seconds, not shift-hours
+8 ptsOEEtypical gain within 90 days of go-live
6–12 moPaybackon the full platform investment
Illustrative outcomes. Results vary by plant, process maturity and data availability.
06 — PROOF
Flexible packaging production line
PACKAGING & LAMINATES · GUJARAT

IPG Asia

From separate screens to one live view of the extrusion-lamination line.

16 wksto production
Liveline visibility
0manual shift reports
Read the engineering note
07 — TECHNICAL FAQ

Before it reaches
your factory floor.

The questions worth asking before you connect a single signal.

Read the architecture brief

VyuOS reads from your existing systems by default; it does not replace PLC or SCADA control logic. Actions are routed through an approval gate. The permitted connections and actions are agreed as part of the plant-specific scope.

The formation is designed around existing PLCs, SCADA, ERP and maintenance systems, using connections such as OPC-UA and MQTT. The walkthrough reviews your actual systems, available signals and access constraints before a connector scope is agreed.

The proposed deployment runs in your own cloud environment, with code, models and infrastructure handed over to you. Hosting, access permissions and data-handling requirements are reviewed for your plant and recorded in the agreed scope.

No. Start with VyuOS and one specialist module on the line with the clearest measurable loss. Additional modules reuse the same twin as you expand; the first deployment does not require the full formation.

Timing depends on data readiness, connector access, the line and the module selected. The first conversation establishes those dependencies; the delivery schedule and acceptance measures are then agreed in the scoped proposal, rather than promised before we see your plant.

Pricing is scoped to the line, connections, selected modules and delivery requirements. Start with a plant walkthrough to define the first engagement. Expansion, support and any ongoing infrastructure costs should be addressed explicitly in the proposal.

08 — COMMERCIAL & DEPLOYMENT MODEL

A scoped start.
Not an all-or-nothing rollout.

Commercial scope follows your plant: the line, the data and the outcome. No one-size-fits-all subscription tiers.

01
FIRST LINE

Prove one outcome.

VyuOS + one specialist module, focused on the loss that matters most.

  • One line and a defined use case
  • Data-readiness and connector scope
  • Agreed success measures
02
PLANT ROLLOUT

Build on the same twin.

Extend to more lines and modules when the first outcome is demonstrated.

  • Additional assets and modules
  • Shared plant context
  • A phased expansion scope
03
OWNERSHIP & HANDOVER

Keep it in your cloud.

Define the handover and operating responsibilities around your team.

  • Code, models and infrastructure
  • Access and governance requirements
  • Support terms agreed in scope
Scope, delivery milestones and commercial terms are agreed in your proposal.
09 — YOUR FIRST CONVERSATION

Bring one line.
Start with its biggest loss.

A plant walkthrough with the engineers who would build it. Review your systems, choose a first module and define what a useful result looks like.

45-minute conversationEngineers, not a sales script
Email our team
ON THE AGENDA
01

Your line

The loss, bottleneck or recurring failure you want to address.

02

Your systems

PLC, SCADA, ERP and the data already available.

03

Your first step

A candidate module, scope and measurable target.